Sari City

Client: Mazandaran Province Regional Water Company

Consultant: Mahab Ghodss Consulting Engineers Company

Contractor: Dezone Engineering Company

Scope of work: PC

Capacity: 129600 m³/day

Location: Sari City

Stage of work:

  • Inlet valve station
  • Aeration
  • Algae removal  (Micro Straining)
  • Coagulation
  • Chemical Preparation and Dosing
  • Clari flocculation
  • Filtration (Gravity rapid and media filters with air and water backwash)
  • Pre and Post Chlorine Disinfection (Gas chlorine)
  • Thickening (Gravity thickener)
  • Dewatering (Centrifugal Decanter)
  • Backwash Recovery
  • Thickened sludge pump station
  • Service water pump station
  • Irrigation water pump station