Salman Farsi Pump station

Client: Fars  Regional Water Company

Consultant: Pars Farazband Consultant Engineers

Contractor: Dezone Engineering Company-Bordoo-Toos Ab

Scope of work: EPC

Capacity: 43200 m³/d

Location: Jahrom City

Stage of work:

  • Steel pontoon
  • Pump station (3 horizontal centrifugal pumps with 900 m^3/hr flowrate -78 m head
  • 300 m of 500 mm,12.5 bar PE pipeline with floaters