Mianeh Water Treatment Plant

Client: East Azarbaijan Province Regional Water Company

Consultant: Abran Consulting Engineers

Contractor: Dezone Engineering Company
, Moujab Consulting Engineers

Scope of work: EPC

Capacity: 38880 m⁄day

Location: Mianeh City

Stage of work:

  • Cascade Aeration
  • Screening
  • Coagulation
  • Chemical Preparation and Dosing
  • Chemical Sedimentation
  • Sedimentation (Pulsator)
  • Filtration (Gravity rapid sand filters with air and water backwash)
  • Pre and  Post Chlorine Disinfection (Gas chlorination)
  • Sludge Thickening (Gravity thickeners)
  • Sludge Dewatering (Filter presses)
  • Backwash Recovery
  • Thickened Sludge Pumping Station